New CNC Cut : HexBeam

Continuing to play more with MASH in Autodesk Maya, I came up with this experiment:  I used a ramp node with a wave to mask where the hexagons are placed, then randomized their scale.  Applied a dark stain on the uncut top, and a natural stain on all the hexagons.  Material is a reclaimed redwood beam.

hexbeam

About half an hour of modeling in Maya, and 1h45min on the X-Carve CNC with a 1/8″ 1-flute upcut endmill.  Probably another half hour of sanding.

New CNC cut: Honeywood

I’ve been teaching myself the MASH toolkit in Autodesk Maya.  It’s been a lot of fun to learn.  As a challenge, I decided to design a hexagonal-based structure, which I then cut into some reclaimed redwood with my X-Carve CNC:

honeywood_mash2

I applied a ‘natural’ stain to the inside section, and a darker ‘walnut’ stain to the outside.  The rough cut was with a 1/8″ 1-flute upcut endmill, and I did a pencil-cleanup pass with a 1/16″ 2-flute upcut endmill.  Whole cut took maybe 45 minutes.  The piece measures 8″ square, and the cut is around 1″ deep at the lowest point.  I used MeshCAM to generate the toolpaths from the stl file exported from Maya.

New Commission: Denali

denali02_webWas recently commissioned to make another Denali cut on my X-Carve.  This time I swapped out the 1/4″ ballnose used for the rough cut for a 1/8″ ballnose on the finish cut:  Really helped the mountain detail pop.

I had split the rough and finish cuts into two files:  Only downside was that using Chilipeppr, it started to choke on the 4.8meg finish pass file. It would cut for 8 seconds, then pause for 4, etc, repeat… making it take waaay longer than it should (3.5 hour finish pass). Talking on the GoogleGroup, I guess this is a known problem, and the SPJS grbl code needs a port from tinyG. Next time I’m going to give UGS a shot…

I’ll give another shoutout to Terrain2STL, the great app I used to generate the terrain data.

New cut: Lake Tahoe

lake_tahoe_sm

Have been trying to get cutting faster: My Denali cut took around 4.5 hours.
I got “Lake Tahoe” down to 1hr 42min : Rough cut was 17 min, finish 1:25. This piece is smaller by 4.5″ (6″x7.5″) based on the aspect ratio of the map, and not as deep of a cut, but I increased my roughcut stepover from 50% to 75%, and increased the final pass speed from 90 to 120″ a min to help with the time. Machine had no issues at these speeds, so I’ll just keep pushing it up…

New cut: “Denali”